Zhejiang Weilan Technology Co., Ltd.

Maintenance

Selection guides, maintenance notes and application stories

Maintenance

Total Nitrogen Analyzer Maintenance: Digestion, Reagents, Checks

A practical maintenance routine for an online total nitrogen analyzer: persulfate digestion, reagent shelf life, tubing and cuvette cleaning, standard checks and alarms.

Maintenance

Flow Cell Scaling on Online Analyzers: Causes, Cleaning, Prevention

Why flow cell scaling builds up on pH, chlorine and conductivity panels, how it distorts readings, how to acid clean safely, and how to stretch cleaning intervals.

Maintenance

pH Electrode Storage: Keep the Glass Wet, Avoid Dry Caps

pH electrode storage needs a KCl filling solution so the glass membrane and junction stay wet. Caps work for short holds; do not store the probe dry or in distilled.

Maintenance

Turbidity Meter Calibration With Formazin Standards and Zero Water

Online turbidity meter calibration usually uses a formazin standard for the span point and particle-free water for the zero. Expired standard, bubbles in the flow cell.

Maintenance

DPD Chlorine Test Procedure: Colour Time and Interferences

A DPD chlorine test is the usual lab method for free and total residual chlorine, but timing, pH and worn reagents often push the result high or low. This note walks.

Maintenance

Pulsafeeder Pump Maintenance for Diaphragm, Valves and Hydraulic Ends

Pulsafeeder pump maintenance centres on the diaphragm, valve kit and hydraulic end. Check leaks and flow drift, and replace the diaphragm on the series interval.

Maintenance

Metering Pump Vibration: Check the Base and the Pipe First

Metering pump vibration is either the skid shaking or the discharge pipe jumping. Check anchors, alignment, flex connectors and supports before blaming the damper.

Maintenance

Metering Pump Storage: Long-Term Shutdown and Recommissioning

A practical metering pump storage routine: flush the head, protect diaphragm and valves, look after gearbox and hydraulic oil, keep electrics dry and restart safely.

Maintenance

How to Clear Injection Valve Clogging from Scale or Polymer

Injection valve clogging often comes from crystals, polymer or a stuck check. Rising pump pressure with no dose is the usual sign. Depressurise, then clean the valve.

Maintenance

Dosing Line Flushing: Chemical Changeover and Shutdown Procedure

Dosing line flushing explained: when to flush before a chemical changeover or shutdown, how to plan flush connections, step-by-step procedure and waste handling.

110 items · Page 1 of 11