SEKO Metering Pump Calibration Column Sizing and Flow Verification Guide

Author: Zhejiang Weilan Technology Co., Ltd.Source: Official sitePublished: Category: News
Summary: How to size and install a suction-side calibration column for SEKO metering pumps, measure true 60-second output under real backpressure, and troubleshoot errors.

Even when a SEKO metering pump is set to 50% stroke or frequency, real-world output can shift slightly with pipeline backpressure, fluid density, and temperature. Running a quick drawdown test with a suction-side SEKO calibration column under live operating pressure ensures true dosing accuracy before commissioning.

This guide covers column sizing, installation, four-step testing, and error troubleshooting based on SEKO commissioning standards.

1. Sizing and Placing a SEKO Calibration Column

A calibration column is a graduated transparent cylinder (UPVC, PVDF, or borosilicate glass) installed between the chemical tank and the pump suction port using isolation ball valves:

  • Volume sizing rule: Multiply the pump's 1-minute maximum rated output by 1.2 to 1.5. For a 30 L/h (500 mL/min) pump, choose a 500 mL or 1,000 mL column; for 60 L/h, choose 1,000–1,500 mL.
  • Test under real discharge pressure: Never disconnect the discharge tubing to pump into an open beaker for calibration, because zero-backpressure tests over-report true pressurized flow.

2. Four-Step Live Drawdown Calibration

  1. Fill to zero mark: Open the tank fill valve until chemical reaches the top 0 line, then close the main tank isolation valve.
  2. Dose against live line pressure: Keep the SEKO metering pump injecting into the pressurized process header while drawing solely from the calibration column.
  3. Time 60 seconds accurately: Run for 60 seconds with a stopwatch, stop or switch back to the tank, and read volume $V$ (mL) at eye level.
  4. Convert to L/h: Calculate $Q( ext{L/h}) = V( ext{mL}) imes 60 / 1000$. Repeat 3 times, average the result, and fine-tune frequency or stroke length.

3. Troubleshooting Deviations Over ±5%

If measured flow reads low or erratic, verify the column top vent is open, check three-way unions for suction air leaks, and inspect check valves for scale buildup. If flow reads high or continues dropping while stopped, add a 0.15–0.25 MPa backpressure valve.

Conclusion

Verifying 1-minute drawdown with a suction-side SEKO calibration column under live backpressure locks dosing accuracy within ±2%. Visit Products or Contact Us for 100–10,000 mL calibration column kits.

FAQ

Can I cap the top vent on a calibration column?

No. Capping the vent creates vacuum inside the column as liquid drops, starving the pump. Route the vent line safely back to the top of the chemical tank.

Can glass columns be used with hydrofluoric acid or hot caustic?

No. Both attack glass over time; specify PVC, PFA, or graduated PP columns for HF and strong hot caustics.

Can duty and standby pumps share one calibration column?

Yes. Manifold both suction lines through isolation ball valves to one column and test one pump at a time.

Should I recalibrate after replacing a PTFE diaphragm?

Yes. Always run a 1-minute drawdown check after diaphragm replacement, check-valve cleaning, or major line pressure changes.

Do you stock calibration columns with isolation valves and brackets?

Yes, we supply 100 mL to 10,000 mL UPVC, acrylic, and borosilicate calibration columns with mounting kits.

Get a Quote

Leave your requirements and we will reply within 1 business day

Inquire Now →