SEKO Metering Pump Maintenance Checklist: Daily, Quarterly, and Annual Schedule
Waiting for a diaphragm to burst before servicing a dosing pump risks flooding the solenoid coil or gearbox with corrosive acid. Following a structured SEKO metering pump maintenance checklist extends equipment life for years at minimal spare-part cost.
Here is the three-tier preventive schedule recommended from SEKO service manuals.
1. Daily Walkaround Checks (One Minute)
- Inspect the weep hole under the pump head: Check the drain slot beneath the head neck. Any chemical droplets or white salt crust indicate early
PTFEdiaphragm micro-cracking requiring immediate replacement. - Listen for cavitation and watch gauge swings: Steady clicking (solenoid) or smooth motor hum (mechanical) is normal; sharp knocking or wild gauge bounce points to a clogged strainer or depleted dampener nitrogen.
- Check gearbox sight glass (
Spring MS1): ConfirmISO VG 220oil sits at the center mark and looks clear, not milky white.
2. Monthly to Quarterly Maintenance
- Clean suction foot valves and Y-strainers: On
PAC,PAM, or hypochlorite lines, flush40–80 meshscreens monthly. - Soak and rinse check valves: Clean ceramic balls and seats in warm water or
5%citric acid (never scrape with metal), reassembling with seat below ball and arrow pointing up. - Verify flow with a calibration column: Measure
1-minutedrawdown under real backpressure each quarter and recalibrate if drift exceeds±5%.
3. Annual Service and Oil Changes
- Gearbox oil (
Spring MS1): ChangeISO VG 220oil after the initial300–500 hourbreak-in, then every3,000–4,000 hours(annually). - Preventive diaphragm swap: Replace
PTFEdiaphragms and O-rings every12 months(6–9 monthsunder8–10 barhigh pressure or strong oxidizers).
Conclusion
Daily weep-hole checks, quarterly valve cleaning, and annual diaphragm replacement keep SEKO metering pump maintenance predictable and inexpensive. Visit Products or Contact Us for annual repair kits.
FAQ
What should I do before storing a SEKO pump idle for over a month?
Flush clean water through the pump head for 5–10 minutes to purge bleach, acid, or polymer, drain completely, and store dry.
Should operators bleed the pump head daily?
No. Once primed and airtight, leave the manual bleed valve closed to avoid wearing out its miniature O-ring.
Why must mechanical pump stroke be set to 0% before replacing a diaphragm?
Zero stroke retracts the pushrod to its mechanical stop so tightening the new diaphragm never over-stretches it on startup.
Should intact-looking ceramic balls still be replaced if backflow persists?
Yes. Microscopic wear grooves prevent tight sealing; replace balls and seats together as a kit if cleaning fails.
Do you stock annual SEKO repair kits and ISO VG 220 oil?
Yes, we supply complete annual kits with PTFE diaphragms, ceramic check valves, and FPM/EPDM seals.