Zhejiang Weilan Technology Co., Ltd.

Lango EX-B & EH-E Digital Metering Pump: Step-by-Step Operation Guide

Author: Zhejiang Weilan Technology Co., Ltd.Source: Official sitePublished: Category: Tech Articles
Summary: Step-by-step commissioning and operation guide for Lango EX-B (0–30 L/h) and EH-E (31.2–75 L/h) digital solenoid metering pumps: priming, mode setup, 4-20mA wiring, and care.

Lango digital metering pumps (EX-B and EH-E series) are widely used in water treatment and chemical dosing skids for their clear digital displays and compact footprints. Based on our Lango EX-B and Lango EH-E listings, here is the standard five-step commissioning workflow.

1. Series Specifications

2. Five-Step Startup Procedure

  1. Verify Piping & Valve Arrows: Confirm suction/discharge tightness and that check-valve arrows point vertically upward.
  2. Prime at 100% Speed: Crack the bleed valve open, run at 100% frequency for 1–2 minutes until bubble-free liquid flows, then close the bleed valve.
  3. Select Control Mode: Choose Manual (+ / - keypad) or 4–20 mA / Pulse external mode.
  4. Open Discharge & Check Pressure: Verify all isolation valves are open and system pressure stays within rated limits.
  5. Drawdown Calibration: Run a 1-minute cylinder check under actual backpressure to confirm dosing rate.

3. Wiring & Maintenance Tips

Use shielded cable for 4–20 mA and float-switch loops, keep suction lift ≤1.5 m, and flush with clean water for 5 minutes before long-term shutdown.

Conclusion

Following the "Check Valves → Bleed at 100% → Set Mode → Verify Flow" sequence makes Lango pump commissioning fast and trouble-free. Contact our team for manuals or spare parts.

FAQ

Why does my new Lango pump click without priming?

Air is trapped in the head—open the bleed valve at 100% speed until steady liquid flows, and check suction clamps for air leaks.

What is the difference between EX-B and EH-E?

EX-B covers 0–30 L/h precision dosing, while EH-E handles higher solenoid flows from 31.2 to 75 L/h.

How do I prevent chemical siphoning after shutdown?

Install a backpressure/anti-siphon valve on the discharge line.

Can Lango pumps use dry-contact start/stop signals?

Yes—wire dry-contact relays or tank float switches to the dedicated control terminals without applying mains voltage.

How should I store the pump during long shutdowns?

Flush with clean water for 5 minutes to clear corrosive or crystallizing residue before powering down.

Get a Quote

Leave your requirements and we will reply within 1 business day

Inquire Now →