Ligao Metering Pump Remote vs Local Start & Check Valve Installation Guide
In automated chemical dosing skids, Ligao metering pumps (such as the DG and DS digital series) are widely used for their stepper-motor precision and flexible control inputs. During commissioning, engineers most often run into two issues: switching between remote and local start, and reinstalling check valves correctly after cleaning. This guide covers both procedures based on official Ligao manuals.
1. Ligao Digital Series Overview
- Ligao DG Digital Series: Vector stepper drive with HMI screen, diaphragm flow
7.5–2000 L/h, max pressure1.6 MPa, supporting flow calibration and 4-20 mA / level / pressure modules. - Ligao DS Digital Series: LCD + keypad interface covering
7.5–2000 L/hand up to1.6 MPa, also available for explosion-proof areas.
2. Remote vs. Local Start Setup
Local (Manual) Mode
Use local mode for priming and commissioning. Press Mode on the keypad to select Local/Manual, set your target flow or stroke frequency, open the discharge valve, and press RUN/STOP.
Remote (External Control) Mode
Use remote mode for PLC, float switch, or SCADA control:
- Wiring: Connect the dry-contact start/stop terminals (DI) and 4-20 mA (+ / -) inside the terminal box. Never apply 220 V AC to dry-contact inputs.
- Menu Setting: Switch the control source to Remote or 4-20 mA in the menu. The pump will only run when the external dry contact is closed.
3. Check Valve Installation Direction
Reversed check valves are the #1 cause of loss of prime:
- Arrows Point Up: Both suction and discharge valve bodies have flow arrows
↑—both must point vertically upward toward the discharge line. - Seat Below, Ball Above: Inside each cartridge, the valve seat always sits beneath the valve ball so liquid lifts the ball on discharge and gravity/backpressure seals it on return.
- Avoid Over-Tightening: Align O-rings flat and tighten evenly without crushing PTFE gaskets.
4. Commissioning Checklist
Prime the pump at atmospheric pressure before opening into pressurized piping. If remote mode fails to start, briefly jumper the DI terminals to isolate whether the fault lies in the pump or external PLC wiring.
Conclusion
Following the correct Ligao metering pump remote/local setup and upward check-valve orientation prevents most startup delays. For manuals, spare valve kits, or sizing help, contact our team.
FAQ
Why doesn't the panel RUN button work in Remote mode?
In Remote mode, local start/stop buttons are locked out by design; the pump waits for the external dry-contact or 4-20 mA/comms command.
What happens if a check valve is installed upside down?
A reversed suction valve blocks intake completely; a reversed discharge valve allows system pressure to backflow into the pump head.
Can Ligao DG pumps use a low-level switch and 4-20 mA at the same time?
Yes, digital series support simultaneous low-level interlock protection and 4-20 mA proportional speed control.
Can a scratched valve ball be reused after cleaning?
No. Even minor scratches cause check-valve leakage and siphon backflow; replace the ball-and-seat kit.
How do I fix a mismatch between displayed and actual flow?
Run a 1-minute drawdown test under actual backpressure and enter the measured volume into the pump's calibration menu.